Warehouse conversions are popular across Teesside and North Yorkshire — but lining industrial shells brings challenges: uneven substrates, thermal upgrades, and long wall runs.
Substrate preparation
Blockwork may need parge coats or leveling before dot-and-dab. Steel columns often require encasement for fire protection before boarding.
Performance upgrades
Building Control may require insulation upgrades to external walls. We install insulated lining systems with vapour control layers where specified.
Coordination with subdivisions
When tenant units are created, partition walls and dry lining should be planned together. Erimus delivers both trades under one programme.